Individually designed homes
House Build Project Management
On a one-off house, decisions about materials, specialist systems and construction details continue throughout the build. Clear contractual responsibilities help ensure that drawings, instructions and cost changes are dealt with by the appropriate people.
Who manages each part of the build?
A house build may involve an architect, structural engineer, quantity surveyor, main contractor and specialist designers. Their responsibilities depend on the contracts in place. The important distinction is between responsibility for producing a design, constructing it, checking the work and controlling expenditure.
Construction management covers the sequence of work on site, labour, subcontractors, material orders and progress against the agreed timetable. Design coordination and independent cost monitoring may remain with the client’s professional team. The allocation differs between traditional and design-and-build contracts.

Keeping decisions and construction on schedule
Construction can be delayed by information that appears minor on a drawing. A window opening cannot be completed accurately without the final frame dimensions, and specialist steelwork may depend on connection details that are issued separately. Missing information can prevent a trade from completing work even when labour and materials are available.
The timing of design decisions matters because manufacturing and installation periods vary. Windows and structural steelwork may need ordering well before installation. Decorative fittings can sometimes be chosen later, provided their positions, supports and service requirements have already been resolved.
Costs and changes
Cost reports should show what the agreed work includes, which allowances remain open and how proposed changes affect the budget. Items outside the main building contract belong on separate lines.
Changes during construction can affect more than the price of the item being changed. Moving a wall may alter structural details, electrical positions and completed work nearby. The building contract should establish how changes are instructed, valued and recorded before the affected work proceeds.
Working with your own advisers
Some clients retain their architect and quantity surveyor throughout construction. Under a traditional contract, the design team will generally remain appointed by the client, while the contractor constructs the works in accordance with the contract. Under design and build, the contractor commonly assumes defined design responsibilities. The precise division depends on the contract and the design obligations it contains.

Related services and planning
Discuss management of your house build
House build project management depends on reliable information about the work being carried out, its cost and the decisions still outstanding. A clear record of instructions and changes is particularly important where several designers or specialist contractors are involved. Further information is available on our contact page and home brief planner.
Plan your project
Custom Home Brief Planner
The home planner records room requirements, design priorities and an indicative budget using your own figures. The figures are for planning purposes and are not a contractor's quotation.
Common questions
Frequently asked questions
Is a contractor the same as a project manager?
Not necessarily. A contractor manages the construction work in their contract, while a separate project manager may also look after design coordination and costs. The contracts should spell out each set of duties.
What does a decision schedule do?
It lists the selections and approvals that design, ordering and construction depend on, with the date each is needed.
Can I retain my own quantity surveyor?
Yes. The contractor needs to know how your surveyor will value work and report costs, so the two roles fit together under the building contract.